pyrova Request a walkthrough
NewBuilt by DeX Agentic, the flagship product of Colakin AI-assisted fire engineering presales

Fire engineering, designed with AI. Signed by engineers.

Pyrova takes a fire-protection company from the first enquiry to a signed, submitted proposal or quote. It reads the tender, applies the right fire code and draws the design: sprinkler layout, pipe routing and sizing, alarm devices and drawing sheets. Every drawing goes to a licensed engineer to edit and stamp before anything leaves the company.

Designs drawn to codeNFPA, UAE, Australia, IndiaDesign & Build and Supply OnlyEvery action on the record
FP-201 · Level 2 · Office B · drawn by PyrovaRev C · Scale 1:100
REMOTE HEAD 3.5 m 14.0 × 6.8 m · 11.9 m² per head RISER R2
REQ-SP-042 · Office B Suggested by Pyrova AI
Hazard class
Ordinary Hazard 1NFPA 13 §4.3.3
Design density
6.1 mm/min over 139 m²NFPA 13 §19.3.3
Head spacing
3.5 m (max 4.6 m)NFPA 13 §10.2.5
Remote head pressure
0.58 bar (min 0.50)Compliant
Awaiting Design Engineer review. Review before approving.
ReadsPDFDWGDXFXLSXCSVScanned drawings
ProducesDXF sheetsPDFXLSXDOCX
Opens inAutoCADYour hydraulic tool
Why Pyrova

Presales still runs on email, spreadsheets and CAD files passed between people.

Tenders read by hand

Fire-safety clauses sit in long specifications, addenda and schedules. Reading them takes engineering time.

Gaps found too late

Missing, unclear or conflicting requirements surface after pricing, or after award.

Quotes take days

Items are matched to products by hand. Datasheets and certificates are attached one by one.

Approvals hard to prove

When the authority or a client asks who signed what, and when, there is no single record.

No pipeline view

Nobody sees open enquiries, quoted value, stuck work or lost reasons in one place.

Designs drafted by hand

Every head, pipe run and alarm device is laid out manually against the code, again for every revision.

Approvals expire

Civil Defence, UL and FM certificates lapse. Without a check, a non-compliant product gets quoted.

Every country, a different code

Hazard classes, spacing, density and required approvals change with the code. One slip and the output fails.

Today vs with Pyrova

The same tender, the same team, without the busywork.

TaskTodayWith Pyrova
Reading the tenderAn engineer reads hundreds of pages and copies clauses into a spreadsheet.Every fire-safety clause is listed with page, quote and confidence. The engineer reviews instead of reads.
Finding gapsMissing and conflicting requirements show up after pricing, or after award.Gaps are flagged and sent as RFIs before a single price is set.
Drawing the layoutHeads, pipes and devices are placed by hand, again for every revision.Pyrova draws the layout to code and sizes the pipes. The engineer edits and stamps.
Building the quoteItems matched one by one; certificates hunted down and attached manually.Quantities come from the drawing, products are matched, certificates attach themselves.
Applying the codeEach engineer remembers the rules for each country.The active code pack drives every check, limit and mandatory item.
Proving who signedEmails, PDFs and memory.A stamp with a verification code and an audit log nobody can edit.
One governed workflow

Every enquiry starts the same way and cannot leave without passing an approval gate.

  1. Intake

    One form or a forwarded email. Each enquiry gets one owner, one status and one deadline.

  2. Classify and choose the code

    Stream A or B, Inhouse or External, project country and fire code. AI suggests; a person confirms.

  3. Go / no-go

    Management records the decision and the reason. A no-go closes the enquiry.

    → splits into Stream A or Stream B
  4. Requirements, drawing, pricing

    AI lists the requirements, draws the design to code and builds the bill of materials. Engineers and estimators confirm.

  5. Approve, stamp, submit

    Technical approval, commercial approval, the engineer's digital stamp, then the transmittal goes out.

AI design drawing

Pyrova draws the fire-protection design. Your engineer signs it.

From the architectural drawing and your inputs, Pyrova lays out the system to the active code, routes and sizes the pipework, and issues drawing sheets. Every element shows the rule it follows, and the engineer can change anything.

  1. 01

    Read the building

    Upload the architectural DXF, DWG or a scaled PDF. Pyrova finds the rooms; you confirm hazard class, ceiling height and obstructions.

  2. 02

    Lay out the devices

    Sprinkler heads, detectors, call points and sounders placed within the code's spacing and coverage limits. Gaps are shown, not hidden.

  3. 03

    Route and size the pipes

    Pipework routed from the riser around obstructions, then sized by hydraulic calculation with pass or fail against the code.

  4. 04

    Issue the sheets

    Layered DXF and PDF sheets with title block, legend and device schedule. Quantities go straight to the bill of materials.

SprinklersHead layout, head type and K-factor, coverage and wall distancesNFPA 13 · AS 2118.1 · NBC Part 4
PipeworkMains, cross mains and branch lines from the riser, with sizesHydraulic limits from the code pack
Alarm and detectionDetectors, manual call points, sounders, speakers and strobesNFPA 72 · AS 1670.1
Hydrants and risersLanding valves, hydrant positions, riser and pump schematicNFPA 14 · NFPA 20 · AS 2419.1
Remote area · FP-201 Rev CSized by Pyrova
Design density
6.1 mm/min
OH1
Remote area
139 m²
NFPA 13
Sprinkler demand
848 L/min
at riser
Remote head pressure
0.58 bar
min 0.50
Max pipe velocity
3.1 m/s
max 4.5

Engineer edit kept: head 7 moved 0.4 m to clear a duct. Checks re-ran; all pass. Submission calcs exported to the accepted hydraulic tool.

Example values for one office floor. Calculations submitted to the authority come from the engineer's accepted hydraulic tool.

Try the rules engine

How many sprinkler heads does your floor need?

A small taste of what Pyrova does on every area of every drawing. Pick a hazard class and a floor area to see the NFPA 13 density/area design basis and the minimum head count.

Indicative only. Pyrova's real layouts follow the project's code pack, ceiling, obstructions and room shapes, and are reviewed by a licensed engineer.

Design basis · NFPA 13 density/area
Design density6.1mm/min
Design area139m²
Max coverage per head12.1m²
Max spacing4.6m
Minimum heads100
Sprinkler demand848L/min
Demand = density × design area, before hose allowance. See how Pyrova draws it →
Two lines of business, one platform

Built for how fire-protection companies actually sell.

STREAM A

Design & Build

Turn a tender into an approved proposal and, once won, into a stamped design package accepted by the authority.

Pre-award
  • Every fire-safety clause listed with section, page, quote and confidence
  • Requirements matrix with gaps raised as RFIs before pricing
  • Design checks and value-engineering options, each approved by an engineer
Post-award
  • Drawing register, revisions and trade coordination log
  • Authority submissions, comments and approvals through to issue for construction
Target: tender to proposal30% faster
STREAM B

Supply Only

Turn a contractor's item list or drawing into a priced, approved quote with certificates attached.

From list to quote
  • Items read from Excel, CSV, PDF schedules and DXF/DWG drawings
  • Catalogue matching with a confidence score; unmatched items shown first
  • Live cost, margin and discount; quotes outside the thresholds go to the Commercial Manager
  • Datasheets and approval certificates attached automatically, with expiry warnings
  • Follow-up reminders until the order is won or lost
Target: enquiry to quote< 1 working day
Country and fire code compliance

Choose the country and code at intake. Everything after follows it.

Each code edition is a versioned code pack: rules, limits, mandatory items and clause references. Requirements, design checks, layouts, bills of materials and quotes are all checked against the active pack.

UAE

Active code standard: UAE FLSC 2018
Primary codes
    Product approvals checked
    Authority
    Currency and time
    Mandatory base items
    RequirementsDesign limitsLayout diagramsBill of materialsQuotesStream A + B
    Bill of materials

    Tender lines mapped to approved products, with the reason for every override.

    #Tender BOQ / CAD layer descriptionQtyProductUnit priceMarginApprovalsStatus
    1Pendent quick-response sprinkler, ½" NPT, K=5.6, 68 °C, chrome1,200 pcsSP-QR-P-56AED 38.0025.0%UL · FM · UAE Civil DefenceAuto-matched
    2Concealed pendent sprinkler, ½" NPT, K=5.6, 68 °C, white cover plate650 pcsSP-CP-56AED 59.0025.4%UL · UAE Civil DefenceAuto-matched
    3Addressable voice evacuation control station
    Mandatory base life safety
    2 systemsEVAC-5000AED 24,500.0024.5%UL · NFPA 72 · UAE Civil DefenceAuto-matched
    46" grooved OS&Y gate valve, 300 psi, supervisory switch8 pcsGV-OSY-150GAED 1,890.0023.3%UL · FM · UAE Civil DefenceManual override
    5Vane-type waterflow detector, 4" pipe, dual SPDT16 pcsWFD-100AED 420.0023.8%UL · FMApproval needed

    Example rows. Line 5 is flagged because the active UAE pack requires Civil Defence approval, which the product does not hold. Line 4 records who remapped it and why.

    AI suggests. Engineers decide.

    Nothing technical leaves without an engineer's approval. Every step is on the record.

    • AI values are always markedEvery AI result shows as suggested, links to its page, clause or drawing area, and waits for a person.
    • A digital stamp with a second factorOnly licence-verified engineers can stamp. A stamped package is locked; changes need a new revision and a new stamp.
    • No one approves their own workTechnical gates go to the Design Engineer, price gates to the Commercial Manager, large bids to Management.
    • An audit log nobody can editEvery change, approval, stamp and dispatch is logged with the person, time and before/after values. Administrators included.
    Audit trail · ENQ-2026-0089GST
    1. Pyrova AI extracted 214 clauses from Spec Rev 2. 9 below confidence threshold.
    2. R. Menon, Estimator confirmed 47 BOM lines; remapped line 4 (stock).
    3. S. Haddad, Commercial Manager approved price at 24.1% margin.
    4. T. Al-Mansoor, Design Engineer stamped package FP-201 Rev C.
    Engineer stamp T. Al-Mansoor · DE #88421 · 14:22 GST Verify: PYR-7K2Q-91XD
    Built for the whole presales team

    Everyone gets back the hours they lose to admin.

    DESIGN ENGINEER

    Check designs, don't draft them

    • Layouts drawn to code, ready to edit
    • Every element cites its clause
    • Stamp with a second factor, from any device
    ESTIMATOR

    Quote in hours, not days

    • Quantities straight from the drawing
    • Catalogue matches with confidence scores
    • Certificates attached for you
    COMMERCIAL MANAGER

    See margin before you sign

    • Live cost, margin and discount
    • Only the quotes that need you reach you
    • Value-engineering options on every bid
    MANAGEMENT

    One view of the pipeline

    • Quoted value by stream, source and region
    • Where work is stuck, and for how long
    • Why bids are won and lost
    What we are building toward

    Targets for the first six months.

    <1 day

    Stream B enquiry to quote issued, down from several days

    100%

    Tender clauses reviewed for gaps before pricing

    85%

    Stream B items auto-matched to the catalogue, confirmed by the estimator

    0

    Quotes issued without the required approval

    Targets set with the business; baselines measured in the first month of use.

    Questions engineers ask first

    Straight answers.

    Does Pyrova replace our design engineers?

    No. Pyrova drafts the layout, sizes the pipework and runs the code checks. A licensed Design Engineer reviews, edits and stamps every drawing. AI can never approve, stamp, submit or send anything.

    Which fire codes does it support?

    NFPA (13, 14, 20, 72 and NFPA 1), the UAE Fire & Life Safety Code of Practice 2018, the Australian NCC with AS 2118.1, AS 2419.1, AS 2941 and AS 1670.1, and India's NBC 2016 Part 4. You choose the country and code at intake; new countries arrive as new code packs.

    Do we have to change our CAD tools?

    No. Pyrova reads your DWG and DXF drawings and writes layered DXF sheets that open in AutoCAD for finishing. Engineers keep the tools they use today.

    Will the authority accept the hydraulic calculations?

    Pyrova sizes the pipework for design. The calculations you submit come from your accepted hydraulic tool: Pyrova exports the drawn network to it and compares the results before release.

    Where is our tender data kept?

    In the UAE, or a region you and your clients approve. Data is encrypted in transit and at rest, and client documents are never used to train shared AI models.

    What do we need to start a pilot?

    One live or recent tender, its architectural drawings in DWG, DXF or PDF, and your product price list in Excel. We set up your code pack and walk your team through the first project.

    by
    Built by DeX Agentic

    Pyrova was built by DeX Agentic, the flagship product of Colakin.

    DeX is Colakin's agentic AI delivery platform. It turns business problems into requirements, documents, wireframes, working software, testing and deployment. Pyrova went through that same path, from a fire-engineering problem statement to the product on this page.

    Visit colakin.ai ↗

    1. 01Problem statement · the presales pain of fire-protection companies
    2. 02Requirements · business and software requirements, traced end to end
    3. 03Design · brand system, wireframes and this page
    4. 04Build, test, deploy · agents that write, check and ship the software
    Pilot programme

    Bring one live tender. See it through Pyrova.

    We will walk your team through intake, requirements, design checks, the bill of materials and sign-off, using your own documents and the fire code your project runs under.

    Preview page: requests are not sent yet.